Hi,
I am trying to build an XML report which shows the status of summary tasks
in my Project.
I have built a customer field using Number1 called PriorityTL, which has
values:
0 - None
1 - Red
2 - Amber
3 - Green
I have assigned these to graphical indicators and that is all working well
in my project.
What I want to do now is build an XML report which will show 4 tables (None,
Red, Amber, Green) and place the tasks inside depending on their PriorityTL.
1. How do I display only Summary Tasks?
<xsl:for-each select="Project/Tasks/Task">
<xsl:if test="Summary[.=1]">
This code will show ALL tasks including summary tasks, but I just want the
summary tasks, not the detail.
2. How do I display only the "Red" tasks?
<xsl:if test="PriorityTL"[.=0/1/2/3]"> doesnt seem to work
<xsl:if test="Number1"[.=0/1/2/3]"> doesnt seem to work either
I think I probably have both the name (PriorityTL or Number1) wrong and the
value (0/1/2/3 vs none, red, amber, green) wrong but I'm not sure.
Thanks for any help! Tag: Master Schedule for Operations Tag: 135116
Baseline Duration Field Not Auto-Calculating
I've begun a schedule by inserting baseline duration, start, and finish
columns, as I've done before. The problem is that the baseline duration
field is not auto-calculating as it normally does. Enter start and finish
dates out comes an estimated duration. For some reason, this isn't happening.
I don't want to have to manually enter each duration. What am I missing?
Your help is appreciated. Tag: Master Schedule for Operations Tag: 135112
Project 2003 - Must "Check In" a project
I was working in Project 2003 pro and it crashed while I had a "Checked Out"
Project. When I tried to open the project again from project 2003, the
project was still marked as "Checked Out".
I am trying to figure out how to reset the file I was working on as now it
is only available read only.
TIA
_-JOE Tag: Master Schedule for Operations Tag: 135104
a good site for learning Project
Hi. I am new to ms Project. Is there a good learning site somewhere.
Any suggestions?
Thanks in advance
Jan Tag: Master Schedule for Operations Tag: 135098
non working days colour coded?
I get how to set up non working days (ie. weekends and holidays)......if I
want to keep track of "rain days" lost in the construction indusrty as a
seperate colour from the standard weekend grey outs.....is there a way? Tag: Master Schedule for Operations Tag: 135097
Road Construction
Does anyone know where I can find a road construction template or a small
sample of one? I've looked through the MS templates but there aren't any that
deal with road construction.
Thanks!
--
John Tag: Master Schedule for Operations Tag: 135096
Task duration
I have a one day task that starts at 8:00 am and ends at 5:00 pm, yet the
number in the duration column field shows as .86. When I change the duration
column field to 1 day, it makes the end time 9:09 am the next day. If I try
to load 8 hours for a resource in this task (the task is a fixed work type
task), it says that the resource is over allocated. Can you tell me what
might be causing this? Tag: Master Schedule for Operations Tag: 135093
linked project missing part of file name
When linking subprojects into the master project, the first letters which
identfy the district where the project is located is being dropped from the
name of the subproject. How do I correct this? Tag: Master Schedule for Operations Tag: 135079
Need to increase the # of characters in a footer in Project.
I need to fit a 3 sentence ITAR footer in my Project file, and Project isn't
allowing more than a specific number of words or characters. Anyone out
there find a way to increase the number of characters that the footer can
handle? Thanks! Tag: Master Schedule for Operations Tag: 135067
hiding tasks within project
Is there a way to have tasks that cannot always be seen, I am not refering to
hiding subtasks but speciffically not showing some tasks when printing etc. Tag: Master Schedule for Operations Tag: 135058
Save Microsoft Project 2007 standard as a web page
How do you save project to in htm/ web page format? I don't see it under
"Save as" as it is in previous versions of MS Project. This is the easiest
way to preserve formatting and paste into Excel to share with people who
don't have Project but need to provide status/ updates. thanks Tag: Master Schedule for Operations Tag: 135057
Linking Subtasks from multiple subprojects
I currently have 5 subprojects with 1 master schedule...I was wanting to
know if it's possible at all to link a task in 3 of the subprojects to one
task in the master?
Example: I have the following subprojects, each having a development task
Subproject 1
Development duration 3/12/08 - 3/14/08 20%
Subproject 2
Development duration 3/14/08 - 3/20/08 10%
Subproject 3
Development duration 3/17/08 - 3/26/08 5%
I would like them all to roll up together in the master...
Master Project
Development duration 3/12/08 - 3/26/08 12%
Is there a way to do this and if so how?
Thanks so much!!! Tag: Master Schedule for Operations Tag: 135056
Actual Work - Distributed in Future
While analysing one of our MS Project 2007 plans, I noticed that one of the
resources has Actual Work entries for future dates - all the way through
April, 2008. This doesn't seem possible and definately isn't legitimate e.g.
he hasn't worked those hours yet and they shouldn't be in the plan as actuals
- IMHO.
We do have a timesheet tool that automatically updates daily actuals onto
our plans and my first thought was that this individual processed future
timesheets and somehow got them through the approval process and got the
hours progressed down to the plan. I ruled this out because this individual
is not ahead on his timesheets.
Microsoft Project automatically distributes planned work but does it do
anything automagically that might explain how future actuals could be present
in the plan?
I appreciate your help.
Mike Kleiman Tag: Master Schedule for Operations Tag: 135055
Material ressource - usage at the start of task
Hi,
I have the impression the following is a stupid question but I don't find
the solution by myself...
I have a ressource with type "material". Let's say this ressource is "steel"
and my project is about building a car.
The car is built on let's say 3 weeks so I would like the "steel" material
usage to change during the 3 weeks: eg: 1 ton used the 1st week, 1 ton used
the 2nd week, 1 ton used the 3rd week ==> like it is for a ressource of type
"work".
Currently, the 3 tons are allocated to the 1st day of the 3 weeks task
"build car". I checked the "accrue at" property and it is set to "prorated"
so I would expect the 3 tons to be allocated on 3 weeks rather than 1 day.
Where am I wrong ??
Thanks in advance
Ludo Tag: Master Schedule for Operations Tag: 135033
Lost tasks
I have an old MSProject created with Project 2000. I know there are about
250 listed tasks; however, when I open it, there are only the first nine.
When viewing the file with 'notepad', I can see a number of other task names
that I know are towards the end of the project (e.g. system test, client
acceptance, etc). Is there anyway of recapturing or rebuilding this
information? Tag: Master Schedule for Operations Tag: 135028
Linking dependencies across Subprojects
Hi -- I'm trying to link dependencies across subprojects and haven't had any
success. For each subproject, the tasks are re-numbered from 1, so I can't
refer to a task in another subproject. However, the online help says:
"If the projects are interrelated, the project manager can create task
dependencies between tasks in different projects. Creating dependencies
between projects makes it easier for different project managers to see how
work by other project managers affects their schedules. "
can anyone help???? if so, thanks in advance! Tag: Master Schedule for Operations Tag: 135014
Manage Production Resources By Project
I need to know what is the best way to measure production support resources
on projects --- this would be a way to track outsourced and internal
resources --- either through Project Management Software or through Access
Database --- thanks!
--
flojoe Tag: Master Schedule for Operations Tag: 135013
Timesheet entry for Admin Projects
MS Project seems to add actual work at the rate of planned work for blank
cells of PWA Timesheet entries. The added actial work only shows up in
Project. It does not add these hours to the Team Members PWA Tasksheet.
Normal project files seem to fill in the blank gaps with 0's.
Is this normal ?
How can stop project from adding actual hours to Admin tasks when the
timesheet has blank cells ? Tag: Master Schedule for Operations Tag: 135009
"Linked Information" prompt when opening a Project file
I have Project 2003 Standard SP2 - stand alone.
When I open an existing file, I get a prompt stating that my file contains
linked information, and asking if I want to re-establish links. I've looked
under "Links Between Projects," and no other files are listed on either tab.
I haven't linked any tasks or other objects that I am aware of. I'm not
sharing resources between projects. What are the ramifications of selecting
either option to the prompt? Tag: Master Schedule for Operations Tag: 135002
problem setting task days & subtask hours
In my current project, I have entered all my Tasks, subtasks, and resourses.
Here is my problem
Some tasks are completed in 1 day (or 8h). These involve multiple subtasks
that use different resources. The total time for all subtasks totals 8h.
(ex. task--plant tours = 1d, subtasks--freezer, warehouse, processor,
packing =2h each)
PROBLEM: when i enter hours for subtasks the main task does not total
correctly, I get ### or other odd items.
Some tasks run 3-4 days, each subtask is equals 1 day. (ex. task--work with
drivers 3d, subtask--tom, dick, harry =1d each)
PROBLEM: when i enter days for each subtask the main task does not toal
correctly
1. How do I correctly enter hours for the subtasks so the main task totals
1d?
2. How do I enter days for subtasks so main tasks total the correct # of
days? Tag: Master Schedule for Operations Tag: 135001
Duplicate Task
All,
A team member has a duplicate task showing up in EPM in his "Tasks". I have
checked the plan in "Resourec Usage" and checked the task in the plan itself
to make sure he wasn't assigned twice. I tried to "Hide" the duplicate task
in EPM. but I get an error message. Please let me know if you have a
suggestion for removing the duplicate task that I have not already tried.
Thanks,
Scott Tag: Master Schedule for Operations Tag: 134999
Default Task Type
I have a web development project whose total cost was based on estimated
development hours * hourly rarte. The project includes 15 modules, each
estimated (hours to complete) separately but with the same hourly rate.
Because of the hours estimates should the task type for resources
(programmers only) be set to Fixed Work rather than the default Fixed
Duration? I'm thinking it makes sense to have the programmer resources be
Fixed Work and then insert a 'Work' column in the Gant Chart view to put the
est hrs for each module for. Does this sound right?
Thanks in advance
JR Tag: Master Schedule for Operations Tag: 134997
MSP07 PDF's Crash?
I have a large MSP07 links, rollup and inserted files that I print out with
Adobe for a PDF file. When I open the PDF, the file crashes. I've tried
making it with a couple of other PDF appications i.e. CutePDF, all with the
same results.
Has anyone had this sort of problem? Or any suggests how how to fix?
Sending the MSP07 file to a normal printer works fine.
Steve Tag: Master Schedule for Operations Tag: 134996
color fill fields
Using MS Proj 2003 - tying to add a column (don't know what type I should
select) and color code the fields to indicate (subjectively) if my projects
are red, yellow or green Tag: Master Schedule for Operations Tag: 134985
Entering Numbers in Cost Column
Can anyone tell me why I cannot enter any numbers into my Schedule. It seems
all the column is locked. All other columns are accessible. I am using
Project 07 Pro.
Thanks Tag: Master Schedule for Operations Tag: 134981
Project 2007 File corrupt
Hello
I have a corrupt project 2007 file. It seemed to work just fine for sometime
and all of a sudden now i get the following error message when trying to open
the file.
"The operation cannot be completed because the source file contains invalid
project data or the total number of rows would exceed the limit of 1,048,000
rows in a project.
Validate the data in the source file, insert fewer rows, delete some rows,
or consider dividing your project into subprojects to provide more space for
tasks and resources"
When i click on ok - i am asked to start it read only but still Project
launches a blank file. Any advice would be great on how i can recover my
files please
Thank you Tag: Master Schedule for Operations Tag: 134975
Trouble saving a 2003 Project file when adding dependency; open er
When working in 2003 Project file after linking tasks or adding dependencies,
I receive a file cannot be opened error and am unable to save the changes.
Error is: The file cannot be opened; check that the filename and path are
correct
This file is not exceedingly large less than 856K, there are 405 tasks and
subtasks
I have tried saving as an MPX format and reopening but it didn't help.
What can I do to eliminate this error? Tag: Master Schedule for Operations Tag: 134973
assign work to resource with definite time
hi;
i am using MSPS 2007.I assign works to resources but i wanna define the
times of working for every resource.for example task A needs 8 hours to
complete and it does by resource 1 and resource 2.i wanna resource 1 works 5
hours and resource 2 works 3 hours on this task.I need this method for my
timesheets.
i dont know how can i define this in MSP.
plz help me.
thanks. Tag: Master Schedule for Operations Tag: 134966
retrive a lost document originally saved in word
i saved a document 3 weeks ago but all i have are the short-cuts that dont
work properly it was an assignment and i sent the original, can i retrive the
original document from word I compressed the folder before i sent it but i
cant seem to trace the original document just the short cuts. Can the
original document be sent back to me as it can not open on my tutors
computer. Tag: Master Schedule for Operations Tag: 134965
not enter actual work in completed task
hi
I'm using Project Web Access & Project professional 2007.
Is there any method for not allow to enter actual work in completed task
from resource timesheet.
Please help me.
Thanks in advance.
-- Tag: Master Schedule for Operations Tag: 134964
good book for ms project 2003
Please any suggestion for a good book for MS project 2003 .
I need to know deep knowledge about MS project 2003
Thanks in advanced Tag: Master Schedule for Operations Tag: 134955
Over allocation symbol
I have designed a project three resources are overallocated.
It shows overallocation symbol beside two resources and red for the other.
My question why it's not showing the over allocation symbol beside all of
them. Tag: Master Schedule for Operations Tag: 134953
Work offline in EPM 2003
Hi, I am using EPM 2003. When I save the schedule offline and
consequently work on the schedule offline, I notice that the resource
rates have changed. Could you please explain what have caused the
different resource rates? Thanks. Tag: Master Schedule for Operations Tag: 134950
Microsoft offfice project
I am trying to insert a poem inside a picture of a flower: how do I insert
the same? Tag: Master Schedule for Operations Tag: 134948
Header Footer Scroll Bar?
I just ran into the weirdest thing. I was working on putting information in
the Center Footer when for some unexplained reason, I may have hit a sequence
of buttons I still so not know which, and a small scroll bar appeared on the
righthand side of the window allowing me to move beyond the last line. Has
anyone ever seen this, and how do you do this? I cannot find a reference to
it anywhere. I am using Project 2007 Pro, no server connection. Tag: Master Schedule for Operations Tag: 134946
Footer Problem
In my Schedule I have to distinct views. One view we call by District has no
issues with viewing the footer. Upon trying to type the same information
into the second view we call Board Member the Center Text will not stay
centered. It is strung out across the top or seems to stay left justified.
No matter what I try with carriage returns or alignment seesm to work. Has
anyone ever run into this problem? I am using MS Project 2007 Pro, not
connected to a server. Tag: Master Schedule for Operations Tag: 134942
Max. Number of activites in Project 2007
What are the Max. Number of activites in Project 2007 that can be done in a
single project.?
--
Thank You,
Madhu Tag: Master Schedule for Operations Tag: 134922
Add resource from Outlook
Hi,
I have done some searching, but haven't come across this problem and
resolution for it:
If I add a resource from Outlook, I find that the name field includes the
contact's e-mail address. I went to Outlook and changed the Display field so
that it only includes the contact's name and tried again, but this time *no*
e-mail address was imported, although the name field was correct!
I'm using Project 2003 with Outlook 2003.
Any help would be greatly appreciated!
--
Thanks!
Dee Tag: Master Schedule for Operations Tag: 134919
Roll-up Costs within Group
I need some help badly. In my schedule I have a column that depicts Cost
called Project Budget. Each School is the Summary task with the actual jobs
being done as the subtasks. When grouped within the district each school
shows the total cost. However, on the District line it shows approximately
twice the amount that should be on the line. So in essence it's counting all
subtask costs and the total at the school and adding them together. I will
send anyone my Project Schedule, this is really critical as this is supposed
to go to print today! - Thus I need the help.
Thanks, Tag: Master Schedule for Operations Tag: 134918
Mapping Access-exported Data Columns to Project Columns
I know some Access, and thinking about the possibilities of pulling data from
a Save As Access DB into reports (rather than cut/past into Excel).
Is there a cross-reference of Project Columns to their related Access Table
and Columns when exported to Access?
--
George H. Foster
Orlando, Florida Tag: Master Schedule for Operations Tag: 134910
Creating Master Schedule with Subschedules
Hello,
I have just been set up with MS 2007 project server and I am trying to
insert my subschedules and want them to flow into what we call a Master
Schedule. What is the most accurate way of doing this?
Thanks! Tag: Master Schedule for Operations Tag: 134907
how can i not display non-working time?
I would like my gantt chart to simply not display non working time like
weekends instead of just greying it out. similarly if i wanted to do a
timeline of hours, it shows them as 24 hr periods, i would like to only see
the 8 work hours Tag: Master Schedule for Operations Tag: 134906
protecting the schedule
hello,
there are a few Project Managers at my work who need to be able to view the
schedules. I'm trying to protect the Project Schedule, so that they cannot
modify it. I went to Save As -> Tools -> General Options and set passwords
and clicked on read only. When I re-open it suggests it to be read only, but
when I click "No", it does not require a password and takes me right in,
letting me modify everything. What can I do?
Thank you Tag: Master Schedule for Operations Tag: 134904
Assigning a Project Task to Lotus Notes
Hi:
Does anybody knows how to send a task to a Lotus Notes?..and if that task
can be posted directly into the To Do list?
Thanks Tag: Master Schedule for Operations Tag: 134903
What does this Macro do?
I found this Macro with my Project Schedule and I have no idea what it does.
I am not well enough versed in VBA to know. Can anyone tell me what this
does? Tag: Master Schedule for Operations Tag: 134896
Failure to Calculate Consistantly Start/Finish Dates
This one has me stumped. I am trying to bulid a template file using SP3 from
an existing file.
Here are the conditions:
1. Calculation set to Automatic
2. % Complete is zero
3. The Predecessor dependency is FS with no lag or overlap
4. Constraint Date, Actual Start, and Actual Finish are NA
5. Duration is 1 day
6. Effort Driven is NO
7. No resources have been assigned
8. Work is 0 hours
In a running string of tasks under the same summary task
Task 251 - for example - will finish on 3 November, and its successor 252
will start on 24 November. A second task - 256 - will have the same
predecsssor (251) will start on 4 November.
If I change 252 to any other ID, then change the predecessor back to 251,
the problem resolves its self.
Any ideas?
--
George H. Foster
Orlando, Florida Tag: Master Schedule for Operations Tag: 134894
MS Project 2007 Known Bugs
Can anyone tell me how many known bugs or is there a list of klnown bugs with
Project 2007 Professional? I'm getting some weird numbers when changing
between views and when exporting information to excel. If you have a list
please let me know. Tag: Master Schedule for Operations Tag: 134893
Has anyone used MS Project for Day to Day operations reflecting field
staff?