Hello, I hope someone can help;
I have 2 exchange 2000 servers both in a single site running in mixed mode.
The 5.5 user migration was done before my arrival, and I want to tidy it up a
bit.
The last 5.5 server has been removed months ago but we are still in mixed
mode, if I wanted to go to native is this the correct path?
1) Delete the user and public folder connection agreements from ADC
2) Delete the Site Replication Service (Does this automatically remove the
Config_CA aggrement from ADC?)
3) Uninstall the ADC from our GC server
Do these steps sound okay? Can this be done in the day without effecting the
users accessing their mail?
Many thanks.