I am planning on upgrading my E2K3 server to W2K3 as well as upgrade my
hardware. NOTE: I will be making the OS a DC/GC as well.
What is the recommended method for doing this?
I was thinking since the versoin of Exchange will be the exact same that I
SHOULD be able to disabel all AV, do a full backup of the IS (using Veritas),
build the new box to the same patch level as a member of the domain and then
simply restore the IS. NOTE: I do NOT want to restore the system state as
the OS will be different AND it will be a DC.
Is it this easy or am I missing something?
Thanks,
Bob